FY5 Bathroom 4

This bathroom was a full renovation, ripped out then dry lined.

Wall dividing the old toilet was knocked down and an RSJ installed and bricked up to support the girder in the roof.

Tiled floor to ceiling with a cladded ceiling. Underfloor heating installed and tiled..